Miyazaki Prefecture: FY2026 Solar Power Generation Equipment Introduction Project for Prefectural Facilities Using a Leasing Model

September 15, 2026

Summary

Miyazaki Prefecture will introduce and manage solar power generation equipment at prefectural facilities through a leasing model to reduce greenhouse gas emissions during normal operations. A participation application is required by September 14, 2026.

Key Information

Location Miyazaki
Opening Status Open for Applications
Application Period Sep 4, 2026 – Oct 9, 2026
Max Subsidy Amount ¥98,000,000
Subsidy Rate Solar power generation equipment: 1/2; Storage batteries: 2/3
Purpose Capital investment / Renewable energy and energy storage / Environment
Eligible Expenses Equipment purchase costs / Construction costs
Eligible Applicants Consortiums / Corporations
Implementing Agency Miyazaki Prefecture
Official Page https://www.pref.miyazaki.lg.jp/kankyoshinrin/kense/chotatsu/20260827104132.html

Through a leasing model, this project aims to install solar power generation equipment and other facilities at prefectural facilities, conduct their operation and maintenance, and reduce greenhouse gas emissions during normal operations by using electricity derived from renewable energy.

Note: A participation application must be submitted in advance. Participation application deadline: September 14, 2026.