Tokushima Prefecture Katsuura Town: FY2026 Agricultural Promotion Measures Project (Farmland and Agricultural Facility Repair Project)
October 8, 2026
36
Akō City, Hyogo Prefecture: Seismic Circuit Breaker Installation Subsidy Program (FY2026)
October 8, 2026
35
Nagano Prefecture, Komoro City: Block Wall Removal Subsidy (FY2026)
October 8, 2026
37
Mie Prefecture Kawagoe Town: FY2026 Subsidy for Installing Self-Consumption Solar Power Generation Equipment, etc.
October 8, 2026
27
Okinawa Prefecture, Ishigaki City: FY2026 Residential Solar Power Generation System Installation Subsidy
October 8, 2026
35
FY2026 Subsidy for Projects to Curb Carbon Dioxide Emissions: Projects to Promote the Use of Hydrogen from Renewable Energy and Other Sources in Local Communities
October 8, 2026
22
Yamaguchi Prefecture, Mine City: Regional Hub Development Promotion Project Subsidy (FY2027)
October 8, 2026
38
Sanmu City, Chiba Prefecture: Sanmu City Three-Generation Cohabitation Support Subsidy
October 7, 2026
52
Chiba Prefecture, Sanmu City: Sanmu City New Marriage Life Support Subsidy
October 7, 2026
59
Energy Conservation and Non-Fossil Energy Conversion Subsidy (Equipment-Based Type (III) Equipment-Based Type and (III) GX Equipment-Based Type), 4th Application Round
October 7, 2026
30
Energy Conservation and Non-Fossil Fuel Transition Subsidy (Equipment-Based Type (IV): Energy Demand Optimization Type), 4th Application Round
October 7, 2026
34
Energy-Saving and Non-Fossil Fuel Conversion Subsidy (Equipment-Unit Type (II) Electrification and Decarbonized Fuel Conversion Type), 4th Call for Applications
October 7, 2026
38
Energy-Saving and Non-Fossil Fuel Conversion Subsidy (Factory/Business Facility Type (IV): Energy Demand Optimization Type), 4th Call for Applications
October 7, 2026
30
Kagoshima Prefecture, Ibusuki City: “Ibusuki City Area Economic Circulation Promotion Project (Visitor Attraction Support Type)” — Second Application Round
October 7, 2026
29
Saga Prefecture: Productivity Improvement Support Subsidy for Continuous Employment Support Facilities, etc. (Round 4)
October 7, 2026
30